Huawei FusionModule1000A Installation Manual page 45

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
Figure 5-6 Assembling a step ladder
Step 2 Place the step ladder in the middle outside the outward opening door of the pre-fab. module,
and mark mounting holes on the concrete pad for the step ladder.
Step 3 Drill mounting holes using a hammer drill.
Step 4 Rotate nuts onto expansion sleeves to prevent the expansion sleeves from fluttering.
Step 5 Knock the expansion bolts vertically into mounting holes until the flat washers are flush with
the floor.
Step 6 Remove the nuts, spring washers, and flat washers.
Figure 5-7 Installing an expansion bolt (unit: mm)
(A) Nut
Issue 03 (2020-06-09)
When you drill a hole using a hammer drill, keep the drill bit perpendicular to the ground and hold
the drill stock firmly with both hands to prevent irregular drilling and damage to the ground.
If the ground is too hard and smooth for the drill bit to fix its position, use a chisel to punch a pit
before drilling.
Copyright © Huawei Technologies Co., Ltd.
5 Installing External Accessories for Pre-fab. Modules
(B) Nut
(C) Nut
38

Advertisement

Table of Contents
loading

Table of Contents