FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
Procedure
Step 1 Wrap the electric heating belt around the drainpipe and water refill pipe outside the pre-fab.
module.
Figure 8-4 Wrap the electric heating belt around the drainpipe and water refill pipe
Step 2 Secure the temperature probe to the pipe using a cable tie.
Issue 03 (2020-06-09)
Secure the temperature probe to the position on the water refill and drainage pipe. The position is the
point where the electric heating belt is wrapped 50 cm long around the water refill and drainage pipe
from the water refill and drainage pipe port.
Copyright © Huawei Technologies Co., Ltd.
8 Installing Devices Inside Pre-fab. Modules
54