Figure 8-26 ASD battery wiring diagram
Figure 8-27 Connecting the reserved battery cable
----End

8.4.3 Installing an External Horn Strobe

Prerequisites
preparing for the Installation
Tools: Phillips screwdriver, step ladder
Materials: external horn strobe and its screws
Skill requirement: common technician
Procedure
Step 1 Remove the sealing plate from the installationposition of the horn strobe.
Issue 03 (2020-06-09)
The pre-fab. modules have been installed.
The position for installing the horn strobe has been specified.