Installing Devices - Huawei OceanStor T Series Quick Installation Manual

Hide thumbs Also See for OceanStor T Series:
Table of Contents

Advertisement

2 Installing Devices

2a
Planning device installation positions
Total required cabinet space = 2 U + 2 U x (Number of 2 U disk enclosures) + 4 U x (Number of 4 U disk
enclosures)
Note: The height of the storage system is measured by the unit of U. 1 U equals 44.5 mm (1.75 inches).
2b
Removing filler panels
Recommended installation positions
Controller enclosure (2 U)
Disk enclosure (4 U)
Disk enclosure (4 U)
Disk enclosure (4 U)
Disk enclosure (4 U)
4
Tips
Install the controller
enclosure in the middle of an
empty 42 U cabinet, namely
between the 15 U mark and
the 18 U mark.
Be certain to next install
other devices below the
controller to prevent the
cabinet from becoming
top heavy.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents