Huawei FusionModule1000A Installation Manual page 68

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
9.
10. Route the ECC800 4G antenna cable from the cable tray to the top of cabinet A1 along
11. Route the 4G antenna cable into cabinet A1 through the cable hole on the top, route the
12. Connect the RF_Z antenna to the RF_Z antenna port on the ECC800.
----End
Issue 03 (2020-06-09)
Figure 8-13 Removing the sealing plate from the suspended ceiling
Push the sealing plate up at the cabinet side to separate the sealing plate hook from the
sealing plate mounting bracket, and remove the sealing plate.
the cable chain.
cable out through the cable manager, and connect the cable to the 4G antenna port on the
ECC800.
Figure 8-14 Installing the antenna
Copyright © Huawei Technologies Co., Ltd.
8 Installing Devices Inside Pre-fab. Modules
61

Advertisement

Table of Contents
loading

Table of Contents