Figure 4-6 Single-capacity base (unit: mm)
Preparations
Tools: torque wrench, adjustable wrench, level, level gauge, hammer drill, right angle, marker,
ink fountain, long leather measuring tape, claw hammer, vacuum cleaner
Materials: single-capacity base, twistlock, expansion bolt, spacer
Skill requirement: skilled technician
Procedure
Step 1 Determine the installation areas on the concrete platforms, and the actual site space. Mark the
installation areas on the concrete platforms using an ink fountain.
Step 2 Determine the installation position for the first base in the installation area based on the site
space, and draw longitude and latitude reference lines between the first base and other bases.
Step 3 Place bases based on the reference lines.
Issue 03 (2020-06-09)
Lines should be perpendicular or parallel, with an angle of 90 degrees at cross points.
The point where the reference lines intersect is the middle point for installing a pre-fab.
module base.