FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
4.
Step 2 Install an antenna.
1.
2.
3.
Issue 03 (2020-06-09)
Figure 8-8 Installing the Micro SD and SIM card
Reinstall the ECC800 main control module in the ECC800 subrack.
Pull the indexing plunger handles at the front and rear of the sliding bases of cabinets in
row A.
Turn the indexing plunger handles at the front and rear of the sliding bases by 90° to
unlock the handles.
Figure 8-9 Unlocking the indexing plunger handles
Slide cabinets in row A from the middle towards the cabinet rear door until they cannot
be moved.