Materials: fire cylinder, high-pressure hose, sealing tape, threaded adapter, I-shaped connector
Skill requirement: common technician
Procedure
Step 1 Move the fire cylinder using a pallet truck to a position near the container door closest to the
installation position.
Do not move the fire cylinder over a long distance by hands.
Step 2 Move the fire cylinder to the installation position and secure it using steel straps.
Keep the pressure gauge panel outwards so that people can view the reading, which also
facilitates later maintenance.
Step 3 Connect the hose to the pneumatic switch.
1.
2.
Issue 03 (2020-06-09)
Wrap the threads with sealing tape to ensure air tightness.
Connect the connection accessories of the pneumatic switch to the pneumatic switch and
the container valve of the fire cylinder respectively.
Connect one end of the pneumatic switch hose to the pneumatic switch and the other end
to the container valve of the fire cylinder.
Copyright © Huawei Technologies Co., Ltd.