Figure 8-10 Pushing the cabinet
Put the RF_Z antenna through the gap between the front of the cabinet and the pre-fab.
module ceiling, and attach the antenna to the top of cabinet A1.
Figure 8-11 Installing the RF_Z antenna
Route the RF_Z antenna through the cable hole at the top of cabinet A1 into cabinet A1,
and route it out of the cabinet through the cable manager.
Lock the indexing plungers at the rear of cabinets in row A, and push the cabinets to the
middle. The axes of the indexing plungers at the front of cabinets in row A automatically
spring out to lock the indexing plungers and secure the cabinets in position.
Attach the 4G antenna to the top of the strong-current cable feeder window on the
pre-fab. module.