Huawei FusionModule1000A Installation Manual page 32

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
Figure 4-9 Securing pre-fab. module bases
Step 7 Level all bases.
1.
2.
3.
(1) Spacer
Spacers delivered with the bases have two specifications: 2 mm and 5 mm thick.
Step 8 Insert a twistlock into the mounting hole in a single-capacity base and keep the lock head in
the pre-fab. module length direction.
Step 9 Pre-mount the nuts onto the twistlocks using an adjustable wrench.
Issue 03 (2020-06-09)
Measure the height of each base using the level gauge, and record the height on its upper
surface using the marker.
Identify the base with the highest upper surface, and use it as the adjustment reference.
Select spacers based on the height difference between a base and the reference base, and
add spacers to adjust the height. Ensure that the height difference is within 5 mm after
adjustment.
Figure 4-10 Installing the washer
Copyright © Huawei Technologies Co., Ltd.
4 Installing Pre-fab. Modules
(2) Base
25