FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
Preparations
Tools: safety helmet, safety belt, step ladder, protective gloves, utility knife
Materials: none
Skill requirement: common technician
Procedure
Step 1 Cut open the protective cover using a utility knife and remove the protective cover.
----End

4.1.3 Hoisting Pre-fab. Modules

Prerequisites
To facilitate subsequent installation, ensure that pre-fab. modules are level after hoisting.
Context
The crane and steel ropes must meet the pre-fab. module hoisting requirements.
Table 4-1 Parameters for hoisting pre-fab. modules
Weight
Net weight: <
14,000 kg
Hoisting Precautions
Stage
Before hoisting
Issue 03 (2020-06-09)
When removing the protective cover, take protective measures for working at heights.
Select an appropriate crane based on standards of the crane company, and ask a
professional to assess the crane onsite.
The hoisting ropes are available.
The positions of pre-fab. module corner fittings are correctly marked.
The doors of pre-fab. modules to be hoisted are closed.
The weather is good without wind when pre-fab. modules need to be hoisted outdoors.
Steel Rope
Length
> 12.5 m
Precautions
Ensure that the crane and steel ropes provide the required bearing
Copyright © Huawei Technologies Co., Ltd.
Steel Rope
Dimensions (H x W x D)
Quantity
4 PCS
2896 mm x 2438 mm x 12,192 mm
4 Installing Pre-fab. Modules