FusionModule1000A40 Prefabricated All-in-One Data
Center
Installation Guide
Stage
Preparations
Tools: crane, torque wrench, steel hoisting rope, level
Materials: pre-fab. module to be hoisted, spacer
Skill requirement: skilled technician, common technician, crane driver
Procedure
Step 1 Adjust the pre-fab. module in the installation direction, connect the steel hoisting ropes, and
hoist the pre-fab. module onto the bases.
Figure 4-12 Hoisting a pre-fab. module
Step 2 Turn the twistlocks in the bases by 90 degrees to lock the pre-fab. module, and tighten the
twistlocks using a torque wrench.
Before you tighten twistlocks, ensure that the twistlocks lock the pre-fab. module.
Issue 03 (2020-06-09)
Precautions
Lift and land a pre-fab. module slowly to prevent shock to
equipment inside it.
Remove the ropes after ensuring that the pre-fab. module is placed
evenly on the four bases.
Copyright © Huawei Technologies Co., Ltd.
4 Installing Pre-fab. Modules