Figure 4-10: Hdd Thermal Pad - IEI Technology ECW-281B-D525 User Manual

Intel atom fanless embedded system rohs compliant, dual gbe lan, com ports, usb 2.0
Table of Contents

Advertisement

ECW-281B/B2-D525 Embedded System

Figure 4-10: HDD Thermal Pad

Replace the HDD bracket onto the bottom surface by aligning the four retention
Step 8:
screw holes in the HDD bracket with those in the back of the bottom surface.
Reinsert the four previously removed retention screws.
Step 9:
Connect the SATA cable connector in the ECW-281B/B2-D525 to the HDD.
Step 10:
Replace the bottom surface to the bottom panel by reinserting the six previously
Step 11:
removed retention screws.
WARNING:
Over-tightening bottom cover screws will cause damage to the bottom
surface. Maximum torque for cover screws is 5 kg-cm (0.36 lb-ft/0.49 Nm).
Step 0:
Page 41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecw-281b2-d525

Table of Contents