Install an 8800 Series Chassis
5.
This chapter includes the following sections:
•
Unpack the XCM8806 Chassis
•
Unpack the XCM8810 Chassis
•
Pre-installation Requirements
•
Rack Mount the 8800 Series Chassis
•
Ground the 8800 Series Chassis
This chapter describes how to install the following chassis models:
XCM8806 chassis
•
XCM8810 chassis
•
The 8800 series chassis fits into a standard 19-inch (48.26 cm) rack.
Read the information in this chapter thoroughly before you attempt
Note:
to install the 8800 series switch.
CAUTION:
Correct lifting of the 8800 series chassis requires two people.
Before you lift a 8800 series chassis, make sure the chassis is empty to
prevent unnecessary weight. This will also prevent damage to the system
components due to possible system chassis flex when lifting.
on page 43
on page 45
on page 48
on page 48
on page 50
Chapter 5. Install an 8800 Series Chassis
5
| 42