Repack The Xcm8806 Chassis - NETGEAR 8800 Series Hardware Installation Manual

Chassis switch
Table of Contents

Advertisement

Nylon straps are necessary to secure the upper shipping carton to
Note:
the pallet.

Repack the XCM8806 Chassis

To repack the chassis:
Attach the ESD-preventive wrist strap to your bare wrist and connect the metal end to
1.
the ground receptacle on the chassis front panel.
Remove all modules and power supplies from the chassis. Follow correct procedures for
2.
removing components.
Using four rack mounting screws, attach the 19-inch support bracket to the equipment rack
3.
immediately below the chassis.
Remove the eight rack mounting screws that secure the chassis to the equipment rack.
4.
On each side of the chassis, place one hand in the empty power supply bay and the other
5.
hand in the recessed hand-hold on the back panel of the chassis.
CAUTION:
Do not use the fan tray handle to lift or maneuver the XCM8806 chassis.
This handle is not designed to support the weight of the chassis.
Slowly guide the chassis out of the equipment rack using the support bracket for support.
6.
Carefully lift the chassis off the support bracket and lower it onto the foam cushion in the
7.
shipping carton base.
Figure 72. Setting the XCM8806 Chassis onto the foam cushion
104 |
Chapter 12. Repack an 8800 Series Chassis
8800 Series Chassis Switch Hardware Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xcm8848tXcm8808xXcm8824f

Table of Contents