NETGEAR 8800 Series Hardware Installation Manual page 103

Chassis switch
Table of Contents

Advertisement

8800 Series Chassis Switch Hardware Installation Guide
Using four mounting screws, attach the support bracket to the equipment rack immediately
3.
below the chassis.
Remove the eight mounting screws that secure the chassis to the equipment rack.
4.
On each side of the chassis, place one hand in the empty power supply bay and the other
5.
hand in the recessed hand-hold on the back panel of the chassis (see
CAUTION:
Do not use the fan tray handle to lift or maneuver the XCM8810 chassis.
This handle is not designed to support the weight of the chassis.
Slowly guide the chassis out of the equipment rack using the support bracket for support.
6.
Carefully lift the chassis off the support bracket and lower it onto wood pallet.
7.
Figure 70. Correct method for lifting the XCM8810 Chassis
At each corner, attach the chassis to the restraining brackets on the shipping pallet.
8.
Figure 71. Recrating the XCM8810 Chassis
Slide the shipping carton down over the XCM8810 chassis.
9.
Place the packing foam on top of the XCM8810 chassis
10.
Close the top flaps on the shipping carton and seal them with packing tape.
11.
Secure the shipping carton with nylon straps.
12.
Chapter 12. Repack an 8800 Series Chassis
Figure
70).
| 103

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xcm8848tXcm8808xXcm8824f

Table of Contents