GE Mark VIeS System Manual page 343

Functional safety systems for general market
Hide thumbs Also See for Mark VIeS:
Table of Contents

Advertisement

155, 163
Description JPDE-[ ] fuse FUA1/FUA2 (JFA connector) is blown.
Possible Cause
The FUA1 or FUA2 fuse is blown.
The 24/48 V dc input is not connected.
Solution
Replace the fuse.
Verify the 24/48 V dc input connections to the terminal board.
If the 24/48 V dc input is not used, this diagnostic alarm can be disabled by setting the InputDiagEnab parameter on the
associated input (DC_24VFdbkMag) to Disabled.
156, 164
Description JPDE-[ ] fuse FUB1/FUB2 (JFB connector) is blown.
Possible Cause
The FUB1 or FUB2 fuse is blown.
The 24/48 V dc input is not connected.
Solution
Replace the fuse.
Verify 24/48 V dc input connections to the terminal board.
If the 24/48 V dc input is not used, this diagnostic alarm can be disabled by setting the InputDiagEnab parameter on the
associated input (DC_24VFdbkMag) to Disabled.
157, 165
Description JPDE-[ ] fuse FUC1/FUC2 (JFC connector) is blown.
Possible Cause
The FUC1 or FUC2 fuse is blown.
The 24/48 V dc input is not connected.
Solution
Replace the fuse.
Verify the 24/48 V dc input connections to the terminal board.
If the 24/48 V dc input is not used, this diagnostic alarm can be disabled by setting the InputDiagEnab parameter on the
associated input (DC_24VFdbkMag) to Disabled.
PDM Power Distribution Modules
Public Information
GEH-6855_Vol_II System Guide 343

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents