GE Mark VIeS System Manual page 332

Functional safety systems for general market
Hide thumbs Also See for Mark VIeS:
Table of Contents

Advertisement

102-103,
110-111
Description JPDB-[ ] fuse FU[ ] is blown
Possible Cause
The specified fuse is blown.
The ac input is not connected.
Solution
Replace the fuse.
Verify the ac input connections to the terminal board.
If the ac input is not used, this diagnostic alarm can be disabled by setting the InputDiagEnab parameter on the
associated input (AC_Fdbk#_Volt) to Disabled.
112,114
Description JPDF-[ ] DC 125V magnitude (JD1/JZ2/JZ3 connector) out of range
Possible Cause
The 125 V dc input is less than DC_125v_Trig_Volt.
DC_125v_Trig_Volt is set too high.
The 125 V dc source voltage is out of range.
The 125 V dc input is not connected.
Solution
Verify that DC_125v_Trig_Volt is set correctly.
If fed from the dc battery Input, check the connections to JD1 and TB1.
If fed from DACA, check the connections to JZ2 and/or JZ3.
Verify the grounding of the dc input signals. Refer to the JPDF help for more info.
If the 125 V dc input is not used, this diagnostic alarm can be disabled by setting the InputDiagEnab parameter on the
associated input (DC_125VFdbkMag) to Disabled.
332
GEH-6855_Vol_II
GEH-6855_Vol_II Mark VIeS Functional Safety Systems Volume II
Public Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents