Installation Tests
ModuLab XM ECS Electrochemical System: Installation Guide
2. Make sure the
Project
tab is selected at the bottom of the left-hand navigation
panel, and click on the plus (+) symbol alongside the
Getting Started
project
to expand it, then expand the sub-elements to reveal the structure as follows:
Underneath the
Getting Started
project there is an experiment called
Potentiostat Test,
then a
Setup
element where the conditions of the experiment
are specified, then a step called
Linear Sweep
Voltammetry.
3. Click on
Potentiostat
Test. This will display the
Start Experiment
screen, with
a tabulated list of potentiostat groups and a cell connection diagram as
follows:
3-7