Installing The Unit; Installing The Fieldbus Junction Box - Pilz PMCprimo C Operating Instructions Manual

Table of Contents

Advertisement

Installation
5.3

Installing the unit

The PMCprimo C is installed in slots 1 and 2 of the servo amplifier PMCprotego D. When
installing, please note the guidelines given under "Installation" in the operating manual for
the servo amplifier.
PMCprotego D.01
PMCprotego D.03
PMCprotego D.06
PMCprotego D.12
Fig.: Slots 1 and 2 for installing the PMCprimo C
5.4

Installing the fieldbus junction box

To network a PMCprimo C via CANopen, PROFIBUS DP you need a fieldbus junction box.
This is available as an
servo amplifier.
Operating instructions PMCprimo C
1002242-EN-03
PMCprotego D.24
accessory [
INFORMATION
Pin assignment, wiring and assembly are described in the operating manual
for the fieldbus junction box.
PMCprotego D.48
PMCprotego D.72
66]. The fieldbus junction box is plugged into the
23

Advertisement

Table of Contents
loading

Table of Contents