Installing Power Supplies - HPE Synergy 12000 Frame Setup And Installation Manual

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

Full-height compute module mezzanine connector definitions
NOTE: The compute module hood label includes the exact mezzanine card locations.
The symbols in the image correspond with symbols on the rear of the frame.
Item
Mezz slot connector identification Supported card types
1
Mezzanine slot 1 (M1)
2
Mezzanine slot 2 (M2)
3
Mezzanine slot 3 (M3)
4
Mezzanine slot 4 (M4)
5
Mezzanine slot 5 (M5)
6
Mezzanine slot 6 (M6)
1
When installing a mezzanine option in mezzanine slot 2, processor 3 must be installed. When installing a mezzanine option in
mezzanine slot 5, processor 4 must be installed.

Installing power supplies

HPE Synergy supports several different types of HPE Synergy power supplies. For more information, see the HPE Synergy
12000 Frame Quick Specs on the Hewlett Packard Enterprise Information Library (http://www.hpe.com/info/qs).
CAUTION: Mixing different types of power supplies in the same frame might:
Limit or disable some power supply features including support for power redundancy.
Cause the system to become unstable and might shut down.
To ensure access to all available features, all power supplies in the same frame should have the same output and
efficiency ratings. Verify that all power supplies have the same part number and label color.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the power supply and the power supply
blank to cool before touching them.
76
Installation
Type C and Type D
1
Type C and Type D
Type C only
Type C and Type D
1
Type C and Type D
Type C
Fabric
Supported ICM bays
1
ICM 1 and 4
2
ICM 2 and 5
3
ICM 3 and 6
1
ICM 1 and 4
2
ICM 2 and 5
3
ICM 3 and 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents