Installing Power Supplies - HPE Synergy 12000 Frame Setup And Installation Manual

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

Item
Mezz slot connector identification
1
Mezzanine slot 1 (M1)
2
Mezzanine slot 2 (M2)
3
Mezzanine slot 3 (M3)
1
When installing a mezzanine option in mezzanine slot 2, processor 2 must be installed.
Full-height compute module mezzanine connector definitions
NOTE: The compute module hood label includes the exact mezzanine card locations.
The symbols in the image correspond with symbols on the rear of the frame.
Item
Mezz slot connector
identification
1
Mezzanine slot 1 (M1)
2
Mezzanine slot 2 (M2)
3
Mezzanine slot 3 (M3)
4
Mezzanine slot 4 (M4)
5
Mezzanine slot 5 (M5)
6
Mezzanine slot 6 (M6)
1
When installing a mezzanine option in mezzanine slot 2, processor 3 must be installed. When installing a mezzanine
option in mezzanine slot 5, processor 4 must be installed.

Installing power supplies

WARNING: To reduce the risk of personal injury from hot surfaces, allow the power supply or power
supply blank to cool before touching it.
50
Full-height compute module mezzanine connector definitions
Supported card
types
Type C and Type D
1
Type C and Type D
Type C only
Supported card
types
Type C and Type D
1
Type C and Type D
Type C only
Type C and Type D
1
Type C and Type D
Type C
Fabric
Interconnect
bay sets
1
ICM 1 and 4
2
ICM 2 and 5
3
ICM 3 and 6
Fabric
Supported ICM bays
1
ICM 1 and 4
2
ICM 2 and 5
3
ICM 3 and 6
1
ICM 1 and 4
2
ICM 2 and 5
3
ICM 3 and 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents