2. After power is applied to the frame, verify that each fan LED is green.

Installing interconnect modules

There are six single-wide interconnect bays in the frame. Installation in the interconnect bays depends on the type of
mezzanine card installed in the compute module and in which mezzanine slot the mezzanine card was installed.
IMPORTANT: If the mezzanine card is not installed properly or the interconnect module installation does not
coincide with the mezzanine card installation, the ports on the interconnect module will not function.
NOTE: For more information on how and where to install mezzanine cards, see the compute module user guide or the
system configuration guide.
Procedure
1. Review the interconnect mapping before selecting the ICM bay to install the interconnect module.
2. If installed, remove the interconnect blank.
Installation