3. Using the screw supplied with the rack, connect the cable to the grounding rail.
Cabling the frame
WARNING: To reduce the risk of electric shock or injury due to high-current electrical energy, be sure that all power
is completely disconnected at the source before beginning any power connections to the power bus bars or power
bus box.
WARNING: Be sure that all circuit breakers are locked in the off position before connecting any power components.
Prerequisites
Download and review the HPE Synergy Cabling Guide from the Hewlett Packard Enterprise Information Library ( http://
www.hpe.com/info/synergy-docs).
84
Installation
Need help?
Do you have a question about the Synergy 12000 Frame and is the answer not in the manual?