WARNING: To reduce the risk of personal injury or damage to the equipment in a rack-free environment:
◦
Never stack the frame on top of another frame.
◦
Never place equipment on top of the frame.
◦
Never place the frame on a surface that cannot support up to 249.50 kg ( 550.00 lb).
HPE Synergy configuration
An initial setup for HPE Synergy requires software release planning and planning the location for each component. To
ensure a proper configuration, review the information in the following documents on the Hewlett Packard Enterprise
website (http://www.hpe.com/info/synergy-docs):
•
HPE Synergy Configuration and Compatibility Guide—This document helps to understand more about each
component and the configuration requirements for installing each component. It provides the following:
◦
An overview of HPE Synergy management and fabric architecture
◦
Detailed hardware component identification
◦
Hardware configuration guidelines
◦
Interconnect, power, and HPE Synergy Console cabling information
•
HPE Synergy Cabling Guide—This document provides detailed information and diagrams on how to cable HPE
Synergy.
•
HPE Synergy Migration Guide—This document takes you through the steps to migrate to the latest offerings of
appliances and Frame Link Modules.
Pallet contents
10
Planning the installation
Need help?
Do you have a question about the Synergy 12000 Frame and is the answer not in the manual?
Questions and answers