HPE Synergy 12000 Frame Setup And Installation Manual page 82

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

CAUTION: To prevent improper cooling and thermal damage, do not operate the frame unless all bays are
populated with either a component or a blank.
Installing the DC power grounding kit (no bracket)
For clarity, the rack is not shown in the images of this procedure.
Prerequisites
The following tools are required to complete this procedure:
T-30 Torx screwdriver
8 mm socket wrench
Procedure
1. Using one hex thread-forming screw and lock washer, connect the grounding cable to the frame.
Tighten the screw to 15lb-in of torque.
2. Using the screw supplied with the rack, connect the grounding cable to the grounding rail.
82
Installation

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Synergy 12000 Frame and is the answer not in the manual?

Table of Contents

Save PDF