Siemens SITRANS FUS1020 Manual page 77

Nema-4/ip 65 clamp-on transit-time flowmeter
Table of Contents

Advertisement

Section 3
Mounting Track
Preparing Mylar Mounting Guide
Wrap the Mylar Mounting Guide around the pipe (Figure 6). Line up both vertical edges of the
guide and, ensuring that it is snug around the pipe, mark along the overlapping edge. Arrange so
that one end overlaps the other by at least three inches. Trim to fit if necessary, but be sure not
to trim at the overlapping end in order to keep it square.
Remove Mylar Mounting Guide and lay it out on a flat surface (Figure 7). Either measure the exact
distance halfway between the overlap edge and the mark at the overlap, or fold the guide from the
overlap edge to overlap mark and draw a line at the fold or halfway point (see below).
Cover
Mounting Guide
Overlap Edge
Circumference
FINDING THE HALFWAY DISTANCE
Figure 5
Figure 6
Mark (or fold) exactly
at half-way point
Figure 7
3-22
1020NFM-1D
O-Ring
Securing
Screws

Advertisement

Table of Contents
loading

Table of Contents