Festo CPV -VI Series Manual page 94

Compact performance cpv valve terminal, pneumatics
Hide thumbs Also See for CPV -VI Series:
Table of Contents

Advertisement

5. Maintenance and conversion
2. Fitting the CPV valve terminal
CPV valve terminal with pneumatic multiple connector
plate
• Place the 3-seal and 4-seal strips in the recesses in
• Place the CPV valve terminal on the pneumatic
CP terminal with foot fastening
• Insert the fastening screws in the right-hand end
CPV valve terminal with wall or hat rail fastening
• Fix the right-hand fastening onto the wall with two
3. Fitting the pneumatic and electrical connections
• Fit the connections in the reverse sequence to that
5-12
the left or right-hand end plate. Press the 2-seal
strips carefully into the threads of the work connec-
tions.
multiple connector plate and tighten the fastening
screws in the left and right-hand end plates with 0.3
Nm. Then tighten the screws in diagonally opposite
sequence with 2 Nm (CPV10/14) or with 4 Nm
(CPV18).
plate and tighten the terminal.
M4 screws or tighten the right-hand hat rail clamping
unit.
described in "Removing CPV valve terminal compo-
nents".
CPV... 9811d

Advertisement

Table of Contents
loading

Table of Contents