5. Maintenance and conversion
PLEASE NOTE
There is only one version of the seal for all valve
plates of the CPV18 valve terminal. The position of
the seal is the same for all valve plates.
• Place the components on the front tie rod. Press the
• Swing the components carefully backwards. Make
• Push the upper tie rod as far as possible into the
• Align the components of the CPV valve terminal on a
• Tighten first the upper tie rod and then the lower tie
CPV... 9811d
components down so that they snap into the tie rod.
sure there is sufficient space for the flat seals.
CPV valve terminal and screw it in a few turns.
flat surface so that they are not offset against each
other.
rod with 0.3 Nm. Then tighten both tie rods with
2 Nm.
5-9