5. Maintenance and conversion
Proceed as follows:
• • Loosen the electrical and pneumatic connections
• • Loosen the CPV valve terminal from the mounting
• • In the case of CPV valve terminals with CP, AS-i or
• • Place the CPV valve terminal on the left-hand end
• • Then loosen the centre tie bolt and remove it.
• • Unscrew the outer tie bolts.
• • Remove the end plate from the CPV valve terminal.
• • Place the right-hand end plate on the CPV valve ter-
5-18
(see section "Removing components from valve loca-
tions").
surface. Proceed in the reverse sequence to that de-
scribed in the sections "Fitting onto a wall", "Fitting
onto a hat rail" or "Fitting with feet" in the chapter
"Fitting".
MP connections, remove the appropriate cover (see
section "Removing components from valve locations").
plate. Loosen the outer tie bolts max. 1 turn (see Fig.
5/1). You thereby avoid overloading the centre tie
bolt.
Make sure that the other components on the CPV
valve terminal remain together.
minal and insert the tie bolts.
CPV... 9811d