Peri SKYDECK Instructions For Assembly And Use page 65

Panel slab formwork
Table of Contents

Advertisement

A12 Striking
Panels
Always begin in the corner where both
infills meet.
– Dismantle Panel SDP in one bay after
the other – begin with the middle pan-
el.
– Lift panel and push approx. 10 cm in
the direction of the compensation
area. Pivot downwards and store in
pallets.
(Fig. A12.03)
Main beams
– Pivot Main Beam SLT slowly down-
wards, remove and store in pallets.
(Fig. A12.04)
Only drophead props (1) with Cover
Strips SAL (4) remain standing.
(Fig. A12.05)
Remaining areas
– Remove props on walls and store in
pallets.
– Remove filler areas around columns.
After reaching the required concrete
strength
– lower drophead props, remove props
and store in pallets.
– remove Cover Strips SAL (4).
With larger spans, begin in the middle
with lowering and removal of the props.
Cleaning
Clean SKYDECK components before
the next use and spray once again, e.g.
with PERI Bio Clean.
See introduction "Cleaning and mainte-
nance".
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
Fig. A12.03
Fig. A12.04
Fig. A12.05
4
1
63

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SKYDECK and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF