A12 Striking - Peri SKYDECK Instructions For Assembly And Use

Panel slab formwork
Table of Contents

Advertisement

A12 Striking

Setting times: see Tables!
Keep access ways free!
Dismantling takes place from a safe and
secure position, e.g. with PERI Stripping
Cart ASW 465.
Lowering
– Lower dropheads over large area. Re-
lease wedges with hammer. Pay at-
tention to direction of wedge!
J Between the panel and slab
underside there is a clearance of
approx. 6 cm. (Fig. A12.01)
Edge infills
Striking takes place firstly on the trans-
verse infills and then the longitudinal
infills.
– Remove props and store in pallets.
– Dismantle system supplements such
as filler timbers, edge beams, end
supports and combiheads, and store
in pallets. (Fig. A12.02)
– Remove filler plates.
Striking is carried out by means of a
safe mobile scaffold!
62
Fig. A12.01
Fig. A12.02
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SKYDECK and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF