A9 SKYDECK platforms
Open edge areas (Area lll)
Start shuttering on structural constraint
points (e.g. wall, casting segment) and
work towards the corner table, Area II.
Slab area (Area lV)
When all edge areas are formed, the
slab surface Area IV is formed in the
usual way with SKYDECK.
Regarding the tightness of the panel
joints, e.g. for casting segments/setting
of stopends, push the panels tightly
together and secure on the last main
beam with Panel Wedge Clips SPKK (20).
Components
2
Main Beam SLT 225
2.6 Main Beam SLT 375
10 Edge Beam SRT
19 Timber
20 Panel Wedge Clip SPKK
45 SKYDECK Platform SDB 300
46 SKYDECK Platform SDB 150
47 SKYDECK Platform SDB 225
2.6
Fig. A9.11
52
Infill areas
Risk of falling!
– Do not erect formwork or step
on cantilevered tables before the
tension chains are securely fixed.
– When lingering on the slab form-
work, measures must be taken to
prevent falling, e.g. PPE.
– Clearly mark unsecured building
edges!
Close infill areas in the inner area, close
infill areas at unsecured building edges
after the platforms have been installed.
2.6
45
20
Fig. A9.10
III
46
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
19
10
20
2
47
2.6
Need help?
Do you have a question about the SKYDECK and is the answer not in the manual?
Questions and answers