Platform Connection CB 160 Introduction Safety Instructions General PERI products have been designed for The maximum bearing capacity of PERI exclusive use in the industrial and com- load-carrying equipment must not be ex- mercial sectors only by suitably trained ceeded!
Page 7
Platform Connection CB 160 Introduction Safety Instructions Product-specific The person who attaches the load to the Before moving, remove or secure any load-carrying equipment must be suffi- loose components! ciently secured against falling. In all cas- es, the load must be secured against...
Climbing Bracket 2. Within the permissible temperature CB 160, is an integral part of the load. limits of -20 °C to +60 °C. 3. When in faultless condition. The Platform Connection CB 160 may 4.
Platform Connection CB 160 Introduction Misapplications The use in a way not intended or deviat- Only PERI original components may be ing from the intended use according to used. The use of other products and the Instructions of Use represents a...
Do not drop the load-carrying equipment. -20 °C to +60 °C in a dry place. During the moving procedure with the Please take care that PERI storage and crane, ensure that components are transport systems do not become dirty picked up and set down so that uninten-...
Platform Connection CB 160 Introduction Checks and Inspections 1. General 2. Purpose The procedure described in this section Due to the check carried out before the conforms with the current German regu- initial operations as well as regularly re- lations regarding checks and inspections.
Page 12
4.5 Inspection before working opera- 4.2 Implementing the inspection tions begin The inspection includes a visual and – Check Platform Connection CB 160 for functional check. any defects. – Deformation and elongation of the – Ensure that the Platform Connection components.
Eigengewicht: / Self-weight: 4,6 kg / 10,1 lbs Do not use the Platform Connection Gehängeneigungswinkel max.30° Lifting angle max.30° CB 160 if the type plate is missing or Siehe Betriebsanleitung! illegible! Follow Instruction for Use! Fig. 1 Translation of the Original Instructions for Use...
(according to DIN 13155 = ratio of the breaking load to the permissible load- bearing capacity) Fig. 2 Before attaching Firmly secure two Platform Connections CB 160 to the Climbing Bracket CB 160 (7). (Fig. 2) Translation of the Original Instructions for Use...
Page 15
Platform Connection CB 160 Application Attaching Attach the crane sling hook (H) to the crane D-ring of the Platform Connection CB 160, and close. (Fig. 3) For transporting the platform assembly, only a four-sling lifting gear with chains of sufficient length and securing mecha- nism may be used! (Fig.
M20 x 130-8.8, verz. 1. Release Nuts (5) M20 (SW 30). 2. Attach two Hex. Bolts (4) M20 (SW 30) through the angle plate (3) and CB 160 Climbing Bracket (7) on the left and right sides. (Fig. 7) 3. Tightly screw on nuts (5).
Page 17
Platform Connection CB 160 Application Assembly versions Position of the Platform Connection CB 160: – on the Climbing Bracket CB 160 (7). – inner wall side (11a). – external guardrail side (11b). – under the platform decking (9). Assembly of the sub-structure...
Page 18
– Remove Platform Connection CB 160 before assembling the strongback (11) in order to prevent any misap- plication. (Fig. 9b + 9c) The Platform Connection CB 160 (Fig. 9a) Fig. 9c can be attached to the Platform Bracket CB 160 (7) for positioning the working platform on the building.
– Ensure lifting is carried out smoothly (no jerking)! – When attaching the lifting gear, check that the Platform Connection CB 160 is securely positioned on the Climbing Bracket CB 160. During transportation Attention − Do not stand under suspended loads! −...
Complete with 2 x 711078 Bolt ISO 4014 M20 x 130-8.8, galv. 2 x 781053 Nut ISO 7042 M20-8, galv. Note Valid only when used in accordance with PERI assembly instructions. Technical data Load capacity 500 kg. Translation of the Original Instructions for Use...
Platform Connection CB 160 EC Declaration of Conformity EG - Konformitätserklärung im Sinne der EG-Richtlinie 2006/42/EG Anhang II,1.A In der Gemeinschaft ansässige Person, die bevollmächtigt ist, die technischen Unterlagen zusammenzustellen: Dipl.-Ing. Rainer Bolz PERI GmbH Rudolf-Diesel-Straße 19 89259 Weißenhorn Beschreibung und Identifi zierung der Maschine:...
Page 23
Platform Connection CB 160 EC-declaration of conformity This document is a translation into English from the German original. EC - declarartion of conformity according to the EU Machinery Directive 2006/42/EG Annex II, 1.A Person residing within the Community authorised to compile the relevant technical documentation: Dipl.-Ing.