Installation In A Marine Environment - Danfoss VACON 100 INDUSTRIAL Operating Manual

Wall-mounted drives
Hide thumbs Also See for VACON 100 INDUSTRIAL:
Table of Contents

Advertisement

Operating Guide | VACON® 100 Wall-mounted Drives
Procedure for EMC Jumpers 2 + 3, MR9A and MR9B
1. Remove the cover of the extension box, the touch shield, and the I/O plate with the I/O grommet plate.
2. Find the 2 EMC jumpers on the EMC board. They are not next to each other. Remove the EMC jumpers.
A The EMC jumpers
Illustration 18:
3. Attach the I/O plate with the I/O grommet plate, the touch shield, and the cover of the extension box.
4. Close the cover of the AC drive.
5. After the change, write "The EMC level was changed" and the date on the "product modified" label. If the label is not yet attached,
attach it on the drive near the nameplate.
Product modified

6.7 Installation in a Marine Environment

When you install the AC drive in a marine environment, see the Marine Installation Guide.
Danfoss A/S © 2019.05
A
EMC Jumpers 2 and 3, MR9A and MR9B
Date:
Date:
Date:
Electrical Installation
AQ298036140958en-000101 / DPD01711| 63

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vacon 100 hvacVacon 100 flow

Table of Contents