Danfoss VACON 100 INDUSTRIAL Operating Manual page 59

Wall-mounted drives
Hide thumbs Also See for VACON 100 INDUSTRIAL:
Table of Contents

Advertisement

Operating Guide | VACON® 100 Wall-mounted Drives
Procedure
1. Find the EMC box. To get access to the EMC jumper, remove the cover of the EMC box.
A The EMC jumper
Illustration 16:
2. Remove the EMC jumper. Attach the cover of the EMC box again.
3. Find the grounding arm and push it down.
A The grounding arm is up
Illustration 17:
4. Attach the cable cover.
5. Close the cover of the AC drive.
6. After the change, write "The EMC level was changed" and the date on the "product modified" label. If the label is not yet attached,
attach it on the drive near the nameplate.
Danfoss A/S © 2019.05
A
Removing the EMC Box Cover, MR8
A
B
Finding the Grounding Arm, MR8
B The grounding arm is down (level C4)
AQ298036140958en-000101 / DPD01711| 59
Electrical Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vacon 100 hvacVacon 100 flow

Table of Contents