Danfoss VACON 100 INDUSTRIAL Operating Manual page 56

Wall-mounted drives
Hide thumbs Also See for VACON 100 INDUSTRIAL:
Table of Contents

Advertisement

Operating Guide | VACON® 100 Wall-mounted Drives
Electrical Installation
Procedure for 200–500 V
1. Find the EMC box. To get access to the EMC jumper, remove the cover of the EMC box.
2. Remove the EMC jumper. Attach the cover of the EMC box again.
3. Find the DC grounding busbar between the terminals R- and U. To remove the busbar from the frame, remove the M4 screw.
56 | Danfoss A/S © 2019.05
AQ298036140958en-000101 / DPD01711

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vacon 100 hvacVacon 100 flow

Table of Contents