Operating Guide | VACON® 100 Wall-mounted Drives
Electrical Installation
11. Close the cover of the drive.
6.5.3 Installing the Cables, MR8-MR9
Context:
Follow these instructions to install the cables and cable accessories. For information on how to comply with the UL regulations in cable
installation, see
6.1.2 UL Standards on
Cabling.
Prerequisites:
Make sure that the delivery contains all necessary components. For the installation, the contents of the accessories bag is needed, see
4.2
Accessories.
Open the covers according to instructions in
6.4.2 Get Access and Locate the Terminals for MR8
and
6.4.3 Get Access and Locate the
Terminals for
MR9.
48 | Danfoss A/S © 2019.05
AQ298036140958en-000101 / DPD01711