Fig. 68: Download Project Data – The Final Verification dialog
The locally calculated CRCs and the online CRCs of the safety project are displayed in the Final Verification
dialog. They are automatically checked for equality and displayed via the column Verification Result. The
user must also check these data for equality and then confirm this by ticking the checkbox. Use the Next
button to move to the next dialog.
Fig. 69: Download Project Data – The Activation dialog
In the Activation dialog the user re-enters the password to activate the safety project on the EL6910/EJ6910
or the logic component. Use the Finish button to complete the download of the safety project.
Verification of the input and output process data
After downloading the safety-related program to the TwinSAFE logic, the user must check that the input
and output process data of the TwinSAFE logic are plausible, within the valid value range and in the ex-
pected magnitude. This is especially true for analog signals, which are transmitted via e.g. PROFIsafe,
FSoE sensors, TwinSAFE SC terminals or external control systems to the TwinSAFE logic. It is particularly
important to check whether the device uses the Motorola or the Intel format or Big or Little Endian.
EL6910
WARNING
Version: 1.8.0
Operation
65