ABB ProcessMaster FEM630 Operating Instructions Manual page 35

Electromagnetic flowmeter
Hide thumbs Also See for ProcessMaster FEM630:
Table of Contents

Advertisement

FE M63 0 | E L EC TR OM AG N E T I C FLOWM E T E R | O I/F E M6 3 0-EN RE V. A
6
. . .Electrical connections
. . .Connection with IP rating IP 68
Electrical connection
NOTICE
Adverse effect on the IP rating IP 68
The IP rating IP 68 of the sensor may be adversely
affected as a result of damage to the signal cable.
• The sheathing of the signal cable must not be
damaged.
1
Use the supplied signal cable to connect the sensor and
the transmitter.
2
Connect the signal cable in the terminal box of the
sensor.
3
Route the cable from the terminal box to above the
maximum flooding height of 16.4 ft (5 m).
4 Tighten the cable gland.
5
Carefully seal the terminal box. Make sure the gasket for
the cover is seated properly.
Note
As an option, the sensor can be ordered with the signal cable
already connected to the sensor and the terminal box already
potted.
Potting the terminal box on-site
CAUTION
Danger to health!
The two-component potting compound is toxic – observe
all relevant safety measures!
Comply with the safety data sheet of the two-component
potting compound before preparations are started.
Risk notes:
• R20: Damaging to health when inhaled.
• R36/37/38: Irritates the eyes, respiratory organs and
the skin.
• R42/43: Sensitization through inhaling and skin
contact is possible.
Safety advice:
• S23: Do not inhale gas/smoke/humidity/aerosol.
• S24: Avoid contact with the skin.
• S37: Wear suited protective gloves.
• S63: In case of an accident due to inhaling: take the
injured person out into the fresh air to rest.
If the terminal box is to be potted subsequently on-site, a
special two-component potting compound can be ordered
separately (order no. D141B038U01). Potting is only possible if
the sensor is installed horizontally. Observe the following
instructions during work activity:
Preparation
• Complete the installation before potting in order to avoid
moisture penetration. Before starting, check all the
connections for correct fitting and stability
• Do not overfill the terminal box. Keep the potting
compound away from the O-ring and the gasket / groove
(see Figure 37).
• Prevent the two-component potting compound from
penetrating the cable conduit (Conduit) for an ½ in NPT
installation (if used).
Procedure
1
2
3
4
1
Packaging bag
2
Connection clamp
3
Two-component potting compound
4
Drying bag
5
Maximum fill level
Figure 37 Terminal box sealing
1
Cut open the protective enclosure of the two-component
potting compound (see packing).
2
Remove the connection clamp of the potting compound.
3
Knead both components thoroughly until a good mix is
reached.
4 Cut open the bag at a corner. Perform work activity
within 30 minutes.
5
Carefully fill the terminal box with the two-component
potting compound until the connection cable is covered.
6
Wait a few hours before closing the cover in order to
allow the compound to dry, and to release any possible
gas.
7
Ensure that the packaging material and the drying bag
are disposed of in an environmentally sound manner.
35
5
G12152

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents