ABB ACH580 Series User Manual page 19

E-clipse bypass and packaged drive
Table of Contents

Advertisement

10
ACH580 E-Clipse bypass and packaged drive user manual
Connection and wiring diagrams – Box E-Clipse Bypass
ACH580 Box E-Clipse Bypass units are configured for wiring access from the top
(for UL (NEMA) Type 1 and 12) and from the bottom (for UL (NEMA) Type 3R). The
following figures show the layout and wiring connection points. For drive control
wiring, see page 52. Maintain appropriate separation of control and power wires.
User Power
Cable Guides
ACH580 Drive
E-Clipse Bypass
Control Board
Motor
Terminals (X2)
Terminals
Motor Ground
Fuses
Lug
Service Switch
Input Ground
(Optional)
Lug
Disconnect Switch
or Circuit Breaker
Input Terminals
MOV and
Line Reactor
(Optional)
B1
(Bx1-1, Bx12-1)
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents