5. Load the HDP film, ensuring that each spool is correctly fitted to the corresponding color cartridge, and
the film is not loose.
Note: Used film should have used panels to the left of the purple roller and new panels to the right of
the purple roller.
6. Push up the HDP film loading handle.
7. Twist the accumulator unit 90 to the left. Push down in the center of the accumulator unit until it clicks
into place.
22
Setup and installation
PLT-02931, Rev. A.0
September 2018