Installing The Switch And Socket On The Carrier (19", Power Supply) - Siemens FS20 Mounting & Installation

Fire detection system
Table of Contents

Advertisement

6.7 Installing the switch and socket on the carrier (19",
Building Technologies
Fire Safety

Installing the switch and socket on the carrier (19", power supply)

power supply)
The carrier (19", power supply) FHA2022-A1 is supplied without a main switch and
socket. A single carrier or the first carrier (19", power supply) must be equipped
with the main switch supplied with the housing FH2080-AA. Mounting of the socket
is optional.
6
5
Figure 152: Installing the main switch and socket
1
Carrier (19", power supply) with two power supplies
2
Euro socket (option)
3
Fixing cam for installation on the DIN rail
4
Main switch (cabinet accessory)
5
DIN rail
6
Primary connection terminals with fixing clamp on the left and right
w The fixing clamp on the right of the terminal block (6) must be removed or
offset to the right (as shown).
1. First install the main switch (4) on the DIN rail (5) of the first carrier (19", power
supply) (1) by sliding the main switch sideways along the DIN rail (5) as far as
the primary connection terminals (6).
2. Then install the socket (2) on the DIN rail (5) by hanging the socket on the DIN
rail (5) at an angle from above and pressing down until the cam (3) snaps into
place.
3. Slide the installed parts to the left as far as the terminal block and fix the parts
again with the right fixing clamp.
Mounting and installation FC2080
1
2
3
4
3
6
281 | 354
008851_s_en_--
2016-01-27