ZXHN H267N Maintenance Management Guide
6.11 Configure the ETH Uplink Management
This page will help you convert LAN to WAN interface.
Steps
1. On the main page of the ZXHN H267N, select Management & Diagnosis > ETH
Uplink Management to go to the ETH Uplink Management page, as shown in
6-19.
Figure 6-19 ETH Uplink Management Page
2. Once radio buttonOn is set and Apply button is pressed, the device will reboot and
will work as WAN interface. Otherwise, when Off is applied, the device will work as
LAN interface.
3. Click Apply button to apply the changes.
– End of Steps –
6.12 Configure the IPv6 Switch
This page provides
Steps
1. On the main page of the ZXHN H267N, select Management & Diagnosis > IPv6
Switch to go to the IPv6 Switch page, as shown in
SJ-20140702105807-002|2014-11-13 (R1.0)
IPv6
switch function.
6-16
Figure
6-20.
ZTE Proprietary and Confidential
Figure