Basic Sequence Of Operations For A Print Job (Mono Color) - Canon Color iR C3480 Service Manual

Table of Contents

Advertisement

Chapter 3
Porigon Motor
(M13)
Image reguest
signal (PVREQ)
Laser activation
Drum/ITB motor
(M1)
Primary
charging bias
Developing bias
Primary
transfer bias
Secondary
transfer bias
Cassette 1 pickup
motor (M4)
Cassette 1 pickup
solenoid (SL2)
Registration
clutch (CL6)
Fixing heater
(H1)
Fixing motor
(M3)
[1] stabilizes the rotation.
[2] holds toner/carrier on the developing cylinder.
[3] transfers to paper.
[4] cleans the secondary transfer outside roller.
[5] picks up paper from the cassette.
[6] executes registration.
[7] controls 165 to 240 degrees Celcius.
[8] controls 140 to 195 degrees Celcius.
[9] executes half-speed rotation (to increase temperature of the pressure roller).

3.2.3 Basic Sequence of Operations for a Print Job (mono color)

Color iR C3380G / Color iR C2880G / Color iR C3380i / Color iR C3380 / Color iR C2880i / Color iR C2880 / iR C3480 / iR C3480i / iR C3080 / iR C3080i / iR
C2550
Mono, A4, 2 copies, Cassette 1
Period
PSTBY (print standby)
PINTR (initial rotation)
PRINT
LSTR (last rotation)
3-4
Start key
ON
PSTBY
PINTR
PRINT
[1]
[1]
[6]
[5]
[8]
F-3-4
T-3-2
Description
whine the machine is ready to accept a copy/print request signal.
from when a print request signal has been received to when an image signal is
generated.
from when all toner has been transferred to paper to when the paper is delivered.
from when the paper has been delivered to when all drive is stopped.
LSTR
Y
M
C
Bk
Y
M
C
[2]
Bk
Y
M
C
Bk
[3]
[4]
[7]
PSTBY
[8]
[9]
0014-1420

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents