Basic Sequence Of Operations At Power-On - Canon iR5000 Service Manual

Hide thumbs Also See for iR5000:
Table of Contents

Advertisement

3. Basic Sequence of Operations

3.1 Basic Sequence of Operations at Power-On

Scanner HP sensor (PS39)
Scanning lamp (LA2)
Scanner motor (M3)
*1: Shading correction (gain adjustment) is executed 1 sec after the scanning lamp turns on.
*2: Shading correction (CCD original size detection slash level adjustment) is executed 100
secs after the scanning lamp turns on.
3.2 Basic Sequence of Operations in Book Mode
Scanner HP sensor (PS39)
Scanning lamp (LA2)
Scanner motor (M3)
*1: Shading correction (gain adjustment and CCD original size detection slash level adjust-
ment) is executed for every job.
*2: Executed only at the end of a scan job.
Name of period
SREADY(scanner ready)
SCFW(scanner forward)
SCRV(scanner reverse)
STBY(standby)
COPYRIGHT © 2000 CANON INC.
Download Free Service Manual at http://printer1.blogspot.com
Power switch ON
SREADY
*1
Forward
Reverse
F01-301-01
Start key ON
SREADY
*1
Forward
Reverse
F01-302-01
From when the power switch is turned on to when shading cor-
rection ends.
Or, from when the Start key is turned on to when the scanner
reaches scanner start position.
While the scanner is moving forward to scan the original.
While the scanner is moving in reverse.
From when shading correction ends to when the Start key is
turned on or when the power switch is turned off.
T01-302-01
2000 2000 2000 2000
CANON iR5000/iR6000 REV.0 JULY 2000
CHAPTER 1 BASIC OPERATION
STBY
*2
SCFW
SCRV
*2
Start position
Start position
Description
STBY
1-3 R

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir6000

Table of Contents