AGC 200 installation instructions
4189340610 UK
Wiring indicated with dashed line is optional.
For peak shaving, load takeover and mains power export, the configurable current input can be
used to measure phase L1 current.
The application shown is for pulse breakers.
Terminals 59 and 60 are not available on AGC 21x and AGC 22x.
Be aware that the inputs for feedbacks shown above also need a common wire on terminal 91.
(Terminal 91 is common for 77 to 90).
DEIF A/S
Wirings
Page 36 of 67
Need help?
Do you have a question about the AGC 200 and is the answer not in the manual?