Electrical Installation - Multipole Connector - Burkert 8630 Operating Instructions Manual

Top control continuous
Hide thumbs Also See for 8630:
Table of Contents

Advertisement

* Electrical installation - multipole connector

M16
Configuration of the circular connector M 16
Pin
Allocation
B
Setpoint +
A
Setpoint GND
➔ Apply the supply voltage to the circular connector M12
Configuration of the circular connector M 12
Pin
Allocation
1
+ 24 V
2
not connected
3
GND
4
not connected
NOTE
Further installation notes are to be found in the chapter Installation .
After application of the supply voltage, the TOP Control Continuous is in operation. Carry out the
necessary basic settings and initiate self-parametrization of the TOP Control.
M12
External connection/Signal level
(0/4 ... 20 mA
B
or 0 ... 5/10 V)
A
1
3
➔ Apply the setpoint signal to the circular
connector M16
+ (0/4 ... 20 mA or 0 ... 5 / 10 V)
GND
External connection
24 V DC ± 10 %
max. residual ripple 10 %
F
C
IRST
OMMISSIONING
8630 - 35

Advertisement

Table of Contents
loading

Table of Contents