13.11 Final Tasks - Tait TB8100 Service Manual

Hide thumbs Also See for TB8100:
Table of Contents

Advertisement

13.11 Final Tasks

Task 1 —
Final Tests
Task 2 —
Final
Administration
TB8100 Service Manual
© Tait Electronics Limited September 2006
Once you have completed the testing and repair (if required) of the PMU,
carry out the following tasks.
Test the PMU to confirm that it is fully functional again. The recommended
tests are listed below:
1.
Set up the test equipment as shown in
apply power. Check that no alarms are generated.
2.
Reload the customer's configuration (if required).
3.
Check that the output voltages are correct.
4.
Run the Service Kit and carry out the control and supply tests
(Diagnose > Power Management).
It is good practice to record the test results on a separate test sheet. You can
then supply a copy of the test sheet to the customer as confirmation of the
repair.
The final administration tasks are the standard workshop procedures for
updating the fault database and returning the repaired PMU to the customer
with confirmation of the repair.
If the PMU could not be repaired for one of the following reasons:
fault not located
repair of fault failed
Level-1 service centres should return the faulty PMU to the nearest
Accredited Service Centre, and level-2 service centres should return the
PMU to the International Service Centre. Supply details of the customer,
the fault and, if applicable, the attempted repair.
Figure 13.2 on page
Power Management Unit Fault Finding
222, and
247

Advertisement

Table of Contents
loading

Table of Contents