Figure 8.15
Test equipment set-up for the boost regulator board
12V PA
Figure 8.16
Location of test points on the boost regulator board
b
TB8100 Service Manual
© Tait Electronics Limited September 2006
3.
Once connected to the base station, ensure it is in Run Mode.
4.
Select Alarms > Current Alarm Status and check there are no alarms.
If there are, go to
alarms, go to
"Final Tasks" on page
Boost Regulator Board
"Control Board" on page
170.
c
d
Power Amplifier Fault Finding
148. If there are no
12.5VDC
e
169